Introduction
The Pradhan Mantri Gram Sadak Yojana is under implementation in the State since 25th December 2000 as a 100% centrally sponsored scheme with the objective of connecting every village by all weather road by the year 2007.
The primary objective of PMGSY is to provide connectivity to the
unconnected habitations in the rural area by way of all weather
road (with necessary culverts and cross drainage structure).
Habitations with a population of 1000 persons and above were to be
covered in the first three years (2000-03) and all unconnected
habitations with a population of 500 persons and above were
targeted to be connected by the end of the Tenth plan period
(2007).
|